Project F-7

DSC_0082.JPG

In 2000, the Museum embarked on an ambitious plan to recreate the iconic diesel-electric locomotive that once adorned Santa Fe’s great fleet of Chief streamliners. While the railroad used several different models of locomotives to pull these trains, the General Motors Electro-Motive-Division F-7s were the most popular and successful versions.

Santa Fe’s Texas Chief of 1948 to 1971 was no exception when it came to the dominant form of motive power being EMD’s model F-7. Along with the rest of Santa Fe’s famous Chief streamliners, the Chicago-Houston Texas Chief could be found with up to six of the locomotives on the head end in cab or booster form. The iconic Warbonnet paint scheme just seemed to lay naturally on the curved features and stainless steel flanks of the F-7.

After several months of searching for a good candidate for acquisition and restoration, Canadian National F-9A #9167 was located at National Railway Equipment Co. (NREX) of Dixmoor, Illinois. No original F-units survive from Santa Fe’s passenger service with the exception of a cab and booster unit now on display at the California State Railroad Museum in Sacramento. CN #9167, originally built as an F-7, was an ideal candidate, having the same carbody features as the Santa Fe versions.

Following purchase from NREX, the locomotive was shipped to Texas on its own wheels via Chicago and St. Louis. Funding for acquisition was made possible by a lead gift from the Hillcrest Foundation, which enthusiastically supported preservation and restoration of the unit.

The locomotive was painstakingly restored, with extensive body work and painting completed in 2005. The scope of work called for the unit to be cosmetically restored back to the 1952 appearance of an F-7. This required only modest changes to the exterior, which had been remanufactured to F-9 specifications in the early 1970s. Work included the application of stainless steel panels to the exterior of the locomotive’s carbody at the location of those on original Santa Fe passenger units. Paint and graphics were applied using DuPont’s Imron Polyurethane Enamel. Restoration of the locomotive was made possible by a lead gift from the Muckleroy Foundation.

The locomotive received mechanical repairs including extensive work on its 16 cylinder 567C 1,750 hp diesel engine, and replacement of the four D-77 traction motors that had been removed by NREX. The F-9 mechanical upgrades, performed by GM of Canada, were left intact. Restoration was completed in 2006. The unit is now in serviceable condition and operates periodically at the Museum and at special events offsite.

We wish to thank the following organizations and individuals for making Project F-7 possible:

ACQUISITION

Hillcrest Foundation – Founded by Mrs. W. W. Caruth, Sr. (Lead Gift)

Eugene McDermott Foundation

Jack and Nanci Tyler

Mr. E. Lee DeGolyer

Bill & Angela Barrett

Mr. & Mrs. Otto Wetzel

Robert & Tracey Willis

Mr. Elton Vaughan

Jerry R. & Nancy Stricklin Willis

Jerry C. Willis & Family

David & Lisa Gilmore

John L. & Mary Radovich

Mr. Joe Huffman

Mr. Robert LaPrelle

Stanley & Yvonne Smith

Scott & Cathy Luedke

Mr. & Mrs. Joel Price

Mr. Paul Kurilicz

Mr. Bud Weatherson

Union Pacific Railroad

CSX Railroad

Dallas, Garland & Northeastern Railroad

RESTORATION

Dani Muckleroy – in Honor of Dr. Robert Muckleroy (Lead Gift)

Metal-Rehab, Arlington Texas

Mr. Gerald Cochran, NRE, Chicago

Mr. Mark Williams, Kansas City Southern Railroad

Mr. Barry Bledsoe, Bledsoe Brace Systems

Mr. Bob Lavry – Fort Worth & Western Railroad

Mr. Bruce Meyer

Dr. John B. McCall

Mr. Stan Kistler

Mr. Walter Gray, State of California Parks Service/California State Railroad Museum

Mr. Doyle McCormack

Dale & Richard Brand – Brand Sheetmetal

Mr. Dave Eyerman

Mr. Doug Nichols

Mr. Ron Chamberlain

Mr. Jeff Phelps

Mr. Ted Phelps

Mr. Roger Meyer

Mr. Richard Wainscott – CMO, Museum of the American Railroad

PROJECT MANAGEMENT

Robert H. “Bob” LaPrelle, CEO, Museum of the American Railroad

Robert A. Willis, Trustee, Museum of the American Railroad

F-7 Arrives in Dallas’ CJ Yard, June 2000

F-7 Arrives in Dallas’ CJ Yard, June 2000

F-7 Repairs to Locomotive Nose, August 2004

F-7 Repairs to Locomotive Nose, August 2004

F-7 Carbody Repairs

F-7 Carbody Repairs

F-7 Carbody Repairs

F-7 Carbody Repairs

F-7 Preparing Nose Door for New Headlight July 2004

F-7 Preparing Nose Door for New Headlight July 2004

F-7 in Primer

F-7 in Primer

F-7 Application of Yellow Paint

F-7 Application of Yellow Paint

F-7 Masking for Application of Red Paint

F-7 Masking for Application of Red Paint

F-7 Application of Red Paint

F-7 Application of Red Paint

F-7 Red Paint Fully Applied

F-7 Red Paint Fully Applied

F-7 Removal of Paint Masking

F-7 Removal of Paint Masking

F-7 Removal of Paint Masking

F-7 Removal of Paint Masking

F-7 Removal of Paint Masking with Jerry Barton, August 2005

F-7 Removal of Paint Masking with Jerry Barton, August 2005

F-7 “Warbonnet” Paint Scheme Takes Shape

F-7 “Warbonnet” Paint Scheme Takes Shape

F-7 Application of Silver Paint

F-7 Application of Silver Paint

F-7 Paint Mask for Nose Herald

F-7 Paint Mask for Nose Herald

Previous
Previous

Phase II Capital Campaign

Next
Next

Alco-PA-1 Restoration